Preface \ I
前言 \ III
Introduction \ V
引言 \ VII
1 Earthworks \ 1
1.1 Earthwork Volume Calculation and Allocation \ 1
1.2 Earthwork Filling \ 6
1.3 Excavation Machinery and Construction \ 10
2 Piling Works \ 21
2.1 Concept and Characteristics of Pile Foundations \ 21
2.2 Precast Piles Construction Technology\ 22
2.3 Cast-in-Place Pile Construction Technology \ 28
3 Underground Diaphragm Wall \ 39
3.1 Introduction of Underground Diaphragm Wall \ 39
3.2 Construction Technology of Underground Diaphragm Wall \ 41
3.3 Joint Technology of Underground Diaphragm Wall \ 53
4 Caisson Works \ 57
4.1 Introduction of Open Caisson \ 57
4.2 Open Caisson Construction \ 59
4.3 Compressed-air Caisson Construction \ 75
5 Scaffold Works \ 81
5.1 Introduction of Scaffold Works \ 81
5.2 Floor Scaffolding \ 82
5.3 Pick and Lift Scaffolding \ 92
5.4 Attach Lifting Scaffolding \ 93
6 Masonry Works \ 96
6.1 Masonry Material \ 96
6.2 Brick Masonry Construction \ 101
6.3 Block Masonry Construction \ 106
6.4 Winter Construction of Masonry \ 109
7 Reinforcement Works \ 112
7.1 Performance and Inspection of Reinforcement \ 112
7.2 Connection of Reinforcement \ 113
7.3 Replacement of Reinforcement \ 120
7.4 Processing, Installation and Acceptance of Reinforcement \ 121
8 Formwork Works \ 125
8.1 Introduction of Formwork Works \ 125
8.2 Combined Formwork \ 128
8.3 Tool Formwork \ 130
8.4 Permanent Formwork \ 137
9 Concrete Works \ 139
9.1 Preparation of Concrete \ 139
9.2 Transportation of Concrete \ 141
9.3 Placing of Concrete \ 143
9.4 Maintenance of Concrete \ 150
9.5 Concrete Construction in Winter \ 151
9.6 Quality Inspection of Concrete \ 155
10 Prestressed Structural Works \ 158
10.1 Pre-Tensioning Construction of Prestressed Concrete \ 158
10.2 Post-Tensioning Construction of Prestressed Concrete \ 163
10.3 Construction of Prestressed Spatial Steel Structure \ 174
11 Structural Installation Works \ 179
11.1 Lifting Appliances and Equipment \ 179
11.2 Structural Installation of Single-storey Industrial Factory Building \ 185
11.3 Structural Installation of Multi-storey and High-rise Prefabricated Building \ 196
12 Road and Bridge Works \ 206
12.1 Road Subgrade Works \ 206
12.2 Road Pavement Works \ 208
12.3 Introduction of Bridge Works \ 221
12.4 Construction of Bridge Substructure \ 223
12.5 Construction of Bridge Superstructure \ 225
13 Tunnel Works \ 229
13.1 Tunnel Excavation Methods \ 229
13.2 Tunnel Support and Lining \ 236
13.3 Underground Works \ 241
14 Waterproof Works \ 245
14.1 Underground Waterproofing Works \ 245
14.2 Roof Waterproofing Works \ 252
15 Finish Works \ 260
15.1 Plastering Works \ 260
15.2 Veneer Works \ 267
15.3 Door and Window Works \ 272
15.4 Painting and Wallpapering Works \ 277
16 Construction Monitoring Technology of Geotechnical Works \ 284
16.1 Basic Knowledge of Monitoring Technology \ 284
16.2 Settlement Displacement Monitoring Method \ 296
16.3 Pore Water Pressure Monitoring Method \ 304
16.4 Groundwater Level Monitoring Method\ 307
17 Construction Inspection Technology of Geotechnical Works \ 309
17.1 Testing Technology of Static Load Test \ 309
17.2 Static Load Test of Pile Foundation \ 309
17.3 Load Test of Soil (Rock) Foundation \ 312
17.4 In-situ Testing Technology for Geotechnical Works \ 317
References \ 328